Skip Navigation


IMA Journal of Management Mathematics Advance Access originally published online on July 8, 2005
IMA Journal of Management Mathematics 2006 17(2):187-207; doi:10.1093/imaman/dpi037
This Article
Right arrow Full Text (PDF)
Right arrow All Versions of this Article:
17/2/187    most recent
dpi037v1
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Add to My Personal Archive
Right arrow Download to citation manager
Right arrowRequest Permissions
Google Scholar
Right arrow Articles by Zequeira, R. I.
Right arrow Articles by Bérenguer, C.
Right arrow Search for Related Content
Social Bookmarking
 Add to CiteULike   Add to Connotea   Add to Del.icio.us  
What's this?

© The authors 2005. Published by Oxford University Press on behalf of the Institute of Mathematics and its Applications. All rights reserved.

Optimal scheduling of non-perfect inspections

R. I. Zequeira** and C. Bérenguer***

Institut des Sciences et Technologies de l'Information de Troyes, Equipe Modélisation et Sûreté des Systèmes, Université de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, France

** Corresponding author. Email: romulo.zequeira{at}utt.fr

*** Email: christophe.berenguer{at}utt.fr

In this paper, we study the determination of optimal inspection policies when three types of inspections are available: partial, perfect and imperfect. Perfect inspections diagnose without error the system state. The system can fail because of three competing failure types: I, II and III. Partial inspections detect without error type I failures. Failures of type II can be detected by imperfect inspections which have non-zero probability of false positives. Partial and imperfect inspections are made at the same time. Type III failures are detectable only by perfect inspections. If the system is found failed in an inspection, a repair is made which renders the system in a good-as-new condition. The system is preventively maintained following an age-based policy. Preventive maintenance actions return the system to a good-as-new condition. We consider cost contributions of inspections, repairs, preventive maintenance and periods of unavailability. The model presented permits to determine the optimal (constant) inter-inspection period for partial, imperfect and perfect inspections and the optimal times of preventive maintenance actions.

Keywords: unrevealed failures; availability; imperfect inspection; maintenance optimization; renewal theory


Add to CiteULike CiteULike   Add to Connotea Connotea   Add to Del.icio.us Del.icio.us    What's this?




Disclaimer: Please note that abstracts for content published before 1996 were created through digital scanning and may therefore not exactly replicate the text of the original print issues. All efforts have been made to ensure accuracy, but the Publisher will not be held responsible for any remaining inaccuracies. If you require any further clarification, please contact our Customer Services Department.