Skip Navigation



IMA Journal of Management Mathematics Advance Access published online on December 1, 2007

IMA Journal of Management Mathematics, doi:10.1093/imaman/dpm035
This Article
Right arrow Full Text (PDF)
Right arrow All Versions of this Article:
19/2/117    most recent
dpm035v1
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Add to My Personal Archive
Right arrow Download to citation manager
Right arrowRequest Permissions
Google Scholar
Right arrow Articles by Walsh, P. M.
Right arrow Articles by Heavey, C.
Social Bookmarking
 Add to CiteULike   Add to Connotea   Add to Del.icio.us  
What's this?

© The authors 2007. Published by Oxford University Press on behalf of the Institute of Mathematics and its Applications. All rights reserved.

Investigation of rolling horizon flexibility contracts in a supply chain under highly variable stochastic demand

Patrick M. Walsh{dagger}, Peter A. Williams and Cathal Heavey

Enterprise Engineering Research Group, Department of Manufacturing and Operations Engineering, University of Limerick, Limerick, Ireland

Email: patrick.walsh{at}ul.ie

Received on 19 January 2007. Accepted on 3 October 2007.

A discrete-event simulation model of a supply chain has been developed to evaluate operational performance of sharing uncertain information on upcoming demand between an original equipment manufacturer (OEM) and a contract manufacturer under a formal rolling horizon flexibility (RHF) contract in a four-node supply chain. There are two types of RHF contracts evaluated, i.e. RHF contract with constant flexibility and decreasing flexibility bounds. The demand is externalized (i.e. the OEM receives the demand), stochastic and generated according to a gamma distribution. This paper reports on the analysis of RHF contracts operating with coefficients of variation of demand up to 2.00. Analysis of the interaction of RHF contracts with forecasting and the impact an RHF contract has on the transmission of the bullwhip effect are reported here.

Keywords: simulation; discrete event; performance analysis; coefficient of variation; bullwhip; RHF contract


Add to CiteULike CiteULike   Add to Connotea Connotea   Add to Del.icio.us Del.icio.us    What's this?




Disclaimer:
Please note that abstracts for content published before 1996 were created through digital scanning and may therefore not exactly replicate the text of the original print issues. All efforts have been made to ensure accuracy, but the Publisher will not be held responsible for any remaining inaccuracies. If you require any further clarification, please contact our Customer Services Department.